Civil and site design
Site plans for new buildings and parking lots: grading, paving, water and sewer connections, and the drawings the city reviews before a permit.

Before a building goes up, its site has to work: water has to drain away from it, cars have to park and turn, trucks have to reach the loading door, and the building has to connect to water, sewer and storm sewer. A site plan shows all of that, and the city reviews it before it issues a permit.
What a site plan covers
- Grading: the new ground levels, so water runs away from the building and off the pavement.
- Paving and parking: drive entrances, parking stalls, accessible spaces and the routes to the door.
- Utilities: water service, sanitary sewer and storm sewer, sized and connected to the city's mains.
- Erosion control: silt fence, inlet protection and the steps that keep soil on the site during construction.
Working with the city
Cedar Rapids, Marion, Hiawatha and the cities around them each have their own review process. We prepare the plan to their standards, submit it, and answer the reviewers' comments until it is approved.